INTELLIGENT PROCESS OPTIMIZATION

Unlock Hidden Capacity.
Without New Machines.

Maximize output and slash scrap rates. Achieve up to 85% productivity increase on existing brownfield assets using intelligent process optimization.

Powered by Edge AI
Scrap Reduction
Flexible Deployment
PRODUCTIVITY_ANALYSIS.CHART
Throughput Analysis
Output Comparison Units/Shift
350
Before
BASELINE
650
+86%
After
OPTIMIZED
Measured over 90 days on a cable extrusion line.
DATA: VERIFIED CABLE_MFG_CASE
CAPACITY_ANALYSIS.SYS

Thinking of Buying New Machines? Wait.

Buying more machines doesn't fix inefficiencies — it simply scales them. Most factories lose 20–30% of their true capacity.

Unoptimized Cycle Times

Inconsistent steps that slow throughput and disrupt rhythm.

Micro-stoppages

Tiny interruptions that accumulate into massive lost capacity.

Process Drift & Scrap

Waste that goes unnoticed until the batch is completely finished.

THE SOLUTION

Analyze. Adjust. Optimize.

HORUS Optimize goes beyond status monitoring. It correlates critical process parameters — such as mixing ratios, extrusion speed, temperature, and pressure — with real quality and output results. It tells you exactly how to run your line for maximum profitability.

  • Scrap Reduction & QC

    Detect deviations instantly. Identify root cause during production, before waste accumulates.

  • Cycle Time Stability

    Analyze down to the millisecond. Stabilize operations to achieve a "perfect shift" rhythm.

  • Automated Bottleneck Analysis

    Identify constraints limiting the entire line. Focus improvement where ROI is highest.

  • Changeover & SMED Insights

    Reduce setup losses and switch products faster without compromising quality.

PROCESS_OPTIMIZATION.LIVE
OPTIMAL STATE
Temperature
185°C
Optimal
Pressure
4.2 bar
Deviation Detected
Speed
120 m/min
Optimal (+5%)
Scrap Rate
0.8%
Low
AI Recommendation
Increase extrusion speed by 2% to match optimal cooling curve. Predicted quality impact: Neutral.
ALL_PARAMS: OPTIMAL
UPDATE: 1.2s
IMPACT_METRICS.SYS

Proven Impact

Cable Manufacturing
85%
Output Increase

Production jumped from 350 to 650 tons. Achieved in just 4 months.

Textile Manufacturing
40%
Reduction in Downtime

Achieved through rigorous process stabilization and bottleneck analysis.

CTA_MODULE.INIT

Don't Buy More Machines. Make Yours Smarter.

Extract every unit of value from your existing production lines — without new CapEx.